Tag Archives: electric induction motor parts

Y2 near me made in China – replacement parts – in Kemerovo Russian Federation 3kw Series Electric Motors Induction Motor with top quality

Y2  near me  made in China - replacement parts -  in Kemerovo Russian Federation  3kw Series Electric Motors Induction Motor with top quality

We – EPG Group the greatest gearbox & motors , couplings and gears factory in China with 5 diverse branches. For more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

 

Application

Y2 sequence electrical motors are totally enclosed and supporter cooled (TEFC),three-period squire cage induction motor,,produced sort of Y sequence electric motors with new approach.The mounting dimension is conformed with the pertinent needs of IEC specifications.

Y2 series electric powered motors are widely used in a lot of spots,this kind of as HVAC,drilling devices,pumps,supporters winches,air compressors,floor cleansing machunes,transport equipment,foodstuff machines,agriculture equipment and products,and many others.

 

Detailed Item Description

one.CE certificate 
2.Copper wire 
three.Chilly-rolled silicon metal sheet

Running Conditions

Centre height of body size: 63~355mm
Rated voltage: 380v or other voltage  
Rated frequency : 50HZ ,60HZ
Protection class: H .F 
Cooling method : IC0141
Duty: S1 (constant)
Motor mounting sort B3 (IM 1001), B35 (IM 2001), B5 (IM 3001), B14 (IM 3601), B34 (IM 2101) 
Link : Star-relationship for up to 3KW, delta-connection for 4KW and over .
Remark: Motor can be outfitted with PTC,for frame size one hundred sixty and over,also can be geared up with re-greasing aystem.Terminal box on leading, proper facet or left aspect are offered. Key-way can be shut type or opened variety.facet or still left side are accessible. Crucial-way could be shut kind or open up kind.

Wor ept coudition

The motor can operate on the reted electricity constantly under the adhering to condition :
 the altitude is no much more than 1000m and the environmental air temperature is no far more than 
 -15ºC  ~  40ºC .

Technical Info
Note:we can also create customized  motors accordig to clientele special rquirements.

TYPE Output Current (A) Speed Eff. Power
Element
Ist/In Tstart/Tn Tmax/Tn
KW HP 380V 400V r/min %
Y2E1-631-two .18 .25 .fifty three .50 2720 65 .8 5.five 2.2 two.two
Y2E1-632-two .25 .34 .sixty nine .sixty six 2720 68 .81 six.five two.two 2.two
Y2E1-711-two .37 .five .99 .ninety four 2740 70 .81 7 two.2 2.two
Y2E1-712-two .55 .75 1.forty 1.33 2740 seventy three .82 7 two.2 two.3
Y2E1-801-2 .75 1 1.eighty three one.74 2830 75 .83 seven.5 two.two two.3
Y2E1-802-2 one.1 1.five 2.58 2.45 2830 seventy seven .eighty four 7.9 two.two 2.3
Y2E1-90S-two one.five 2 three.forty three three.26 2840 seventy nine .eighty four seven.five two.2 2.3
Y2E1-90L-2 2.2 3 4.85 four.sixty one 2840 eighty one .eighty five 7.five 2.2 two.3
Y2E1-100L-two three four 6.31 six.00 2870 83 .87 seven.5 2.2 2.three
Y2E1-112M-2 4 five.five eight.12 7.seventy two 2880 85 .88 seven.5 2.2 2.three
Y2E1-132S1-two 5.5 seven.5 eleven.04 ten.49 2900 86 .88 7.five two.2 2.three
Y2E1-132S2-2 7.five 10 fourteen.88 fourteen.14 2900 87 .88 seven.5 2 two.3
Y2E1-160M1-two eleven 15 21.34 twenty.27 2940 88 .89 7.5 2 2.three
Y2E1-160M2-two 15 twenty 28.77 27.33 2940 89 .89 7.5 2 two.three
Y2E1-160L-two 18.5 twenty five 34.70 32.97 2940 ninety .nine seven.5 two 2.3
Y2E1-180M-two 22 30 41.27 39.20 2940 90 .9 seven.five 2 2.2
Y2E1-200L1-2 30 forty fifty five.fifty three 52.seventy five 2950 91.two .9 seven.five two 2.2
Y2E1-200L2-2 37 fifty 67.89 sixty four.fifty 2950 ninety two .9 seven.five 2 2.two
Y2E1-225M-two forty five 60 eighty two.13 seventy eight.02 2970 ninety two.3 .nine seven.5 2 two.two
Y2E1-250M-two fifty five 75 99.84 ninety four.eighty five 2970 92.5 .9 seven.five two 2.2
Y2E1-280S-2 seventy five one hundred 134.ninety eight 128.23 2970 93 .9 seven.5 two 2.2
Y2E1-280M-two 90 125 161.sixty three 153.fifty five 2980 93.eight .nine 7.5 2 two.2
Y2E1-315S-2 one hundred ten 150 194.35 184.sixty three 2980 ninety four .ninety one seven.one 1.eight two.2
Y2E1-315M-2 132 a hundred and eighty 232.ninety seven 221.32 2980 ninety four.5 .ninety one seven.1 1.eight 2.two
Y2E1-315L1-2 a hundred and sixty 220 278.73 264.79 2980 ninety four.six .92 7.one 1.eight two.two
Y2E1-315L2-2 two hundred 270 346.58 329.twenty five 2980 94.eight .ninety two 7.1 1.8 two.two
Y2E1-355M-two 250 340 431.87 410.27 2980 ninety five.3 .92 7.one one.six 2.two
Y2E1-355L-two 315 420 544.15 516.94 2980 ninety five.6 .ninety two seven.1 1.6 2.2
Y2E1-631-4 .twelve .sixteen .44 .42 1310 fifty seven .seventy two five.two two.4 2.two
Y2E1-632-four .18 .25 .sixty two .fifty nine 1310 60 .seventy three five.2 2.4 two.2
Y2E1-711-four .twenty five .34 .79 .75 1330 65 .seventy four 5.two 2.four 2.two
Y2E1-712-four .37 .5 one.thirteen one.08 1330 67 .74 five.two 2.four 2.two
Y2E1-801-four .fifty five .75 one.fifty five one.forty seven 1440 seventy one .seventy six 5.seven two.4 2.3
Y2E1-802-4 .seventy five 1 two.03 one.93 1440 73 .77 six two.3 two.3
Y2E1-90S-four 1.1 one.5 2.89 2.seventy five 1400 seventy five .seventy seven 6 two.three 2.three
Y2E1-90L-4 one.5 two three.70 3.fifty one 1400 78 .79 6 two.three two.3
Y2E1-100L1-four two.two 3 5.16 4.90 1430 80 .81 7 two.3 2.3
Y2E1-100L2-four three 4 6.seventy eight six.44 1430 eighty two .82 7 2.three two.3
Y2E1-112M-four 4 5.five eight.82 8.38 1435 eighty four .82 7 2.3 2.3
Y2E1-132S-four 5.five seven.five 11.84 11.twenty five 1440 eighty five .83 7 2.three two.3
Y2E1-132M-4 7.five 10 fifteen.fifty nine fourteen.eighty one 1440 87 .eighty four 7 2.3 two.three
Y2E1-160M-4 eleven fifteen 22.sixty one 21.48 1470 88 .eighty four seven two.two 2.3
Y2E1-160L-4 fifteen twenty thirty.13 28.62 1470 89 .85 seven two.two two.3
Y2-180M-four eighteen.five twenty five 36.11 34.31 1460 90.five .86 seven two.two 2.3
Y2-180L-4 22 30 42.71 forty.58 1460 ninety one .86 7.5 2.2 two.three
Y2-200L-4 thirty forty fifty seven.sixty one 54.73 1470 ninety two .86 7.5 two.2 two.three
Y2-225S-4 37 50 sixty nine.85 sixty six.36 1470 92.five .87 7.five 2.2 two.3
Y2-225M-four forty five sixty eighty four.68 eighty.45 1470 92.eight .87 7.five two.two two.three
Y2-250M-4 fifty five seventy five 103.28 98.twelve 1470 ninety three .87 seven.2 two.two 2.three
Y2-280S-4 75 a hundred 139.sixty four 132.sixty five 1480 ninety three.eight .87 7.two 2.2 2.three
Y2-280M-4 90 one hundred twenty five 166.eighty five 158.51 1480 94.two .87 7.two two.2 two.3
Y2-315S-4 one hundred ten 150 200.97 a hundred ninety.ninety two 1480 ninety four.five .88 7.2 two.2 2.3
Y2-315M-four 132 one hundred eighty 240.forty 228.38 1485 ninety four.eight .88 seven.2 two.one two.3
Y2-315L1-4 one hundred sixty 220 291.09 276.fifty four 1485 ninety four.nine .88 six.nine two.one two.three
Y2-315L2-4 200 270 359.forty 341.43 1485 ninety five .89 six.9 two.one two.three
Y2-355M-4 250 340 442.85 420.71 1490 ninety five.3 .9 6.nine 2.one 2.two
Y2-355L-four 315 420 556.24 528.forty three 1485 ninety five.6 .nine 6.9 2.1 2.two
Y2E1-711-six .18 .twenty five .74 .70 850 fifty six .sixty six four 1.nine 2
Y2E1-712-six .twenty five .34 .95 .ninety 850 59 .sixty eight four 1.9 two
Y2E1-801-six .37 .5 one.30 1.23 890 62 .7 four.seven one.nine 2
Y2E1-802-six .fifty five .75 one.seventy nine one.70 890 65 .seventy two 4.seven 1.nine two
Y2E1-90S-six .75 1 two.18 two.07 910 72.7 .72 5.five two 2.one
Y2E1-90L-6 1.1 one.5 3.01 two.86 910 76 .73 five.5 2 two.one
Y2E1-100L-6 one.5 two 3.eighty five 3.65 940 79 .seventy five 5.five two 2.one
Y2E1-112M-six two.2 three 5.43 5.sixteen 940 81 .76 6.five 2 two.one
Y2E1-132S-6 3 four 7.31 6.ninety five 960 82 .seventy six 6.five two.1 2.one
Y2E1-132M1-six four five.5 nine.fifty two nine.04 960 eighty four .76 six.5 2.one two.1
Y2E1-132M2-six five.5 seven.five 12.sixty two 11.ninety nine 960 86 .seventy seven six.5 two.one two.1
Y2E1-160M-six seven.five ten sixteen.91 16.07 970 87.5 .seventy seven six.5 2 2.one
Y2E1-160L-six eleven 15 23.eighteen 22.02 970 89 .81 six.5 two two.1
Y2E1-180L-6 15 20 31.26 29.70 980 90 .eighty one 6.5 2.one 2
Y2E1-200L1-6 eighteen.five twenty five 37.sixty three 35.75 980 ninety .83 six.5 2.one two
Y2E1-200L2-6 22 thirty 43.twenty five forty one.09 980 92 .eighty four 7 two.1 2
Y2E1-225M-6 30 forty 57.30 54.forty three 980 ninety two.five .86 seven 2.one 2
Y2E1-250M-six 37 fifty 70.44 sixty six.92 980 92.8 .86 seven 2 two
Y2E1-280S-6 forty five 60 85.03 eighty.seventy eight 990 ninety three.five .86 seven 2 two
Y2E1-280M-six 55 seventy five 103.fifty nine 98.41 990 ninety three.8 .86 seven 2 2
Y2E1-315S-6 seventy five one hundred 139.34 132.37 990 94 .87 six.7 2 2
Y2E1-315M-6 90 one hundred twenty five 168.79 a hundred and sixty.35 990 ninety four.2 .86 six.7 two two
Y2E1-315L1-six one hundred ten a hundred and fifty two hundred.ninety seven a hundred ninety.92 990 ninety four.five .88 six.seven two two
Y2E1-315L2-6 132 one hundred eighty 240.66 228.sixty two 990 94.7 .88 6.7 1.9 two
Y2E1-355M1-six a hundred and sixty 220 292.01 277.41 990 ninety four.six .88 6.7 one.9 two
Y2E1-355M2-six 200 270 363.86 345.sixty seven 990 94.nine .88 six.seven 1.9 2.one

Punch-screening-workshop

 

Why us? 
 

one.Minimal MOQ: It can meet up with your marketing company extremely properly.
  
2.Good Provider : We deal with customers as close friends,offering 24 hrs a times 7days a week service assistance.

 three.Good Quality :We have strict quality manage technique.Excellent track record in the industry.
 
four.Rapidly & Cheap Shipping: We have massive price reduction from forwarder.

FAQ

Q: Do you supply OEM support?

A: Yes 

Q: What is your payment expression?

A: thirty% T/T in advance, 70% harmony when obtaining B/L copy.  Or irrevocable L/C.

Q: What is your guide time?

A: About 30 times soon after receiving deposit or first L/C.

 

The use of authentic equipment manufacturer’s (OEM) component quantities or emblems , e.g. CASE® and John Deere® are for reference reasons only and for indicating solution use and compatibility. Our company and the outlined alternative components contained herein are not sponsored, accepted, or created by the OEM.

Y2  near me  made in China - replacement parts -  in Kemerovo Russian Federation  3kw Series Electric Motors Induction Motor with top quality

Y2  near me  made in China - replacement parts -  in Kemerovo Russian Federation  3kw Series Electric Motors Induction Motor with top quality