Furthermore, all our creation techniques are in compliance with ISO9002 requirements. Because of to our broad product assortment and abundant ordeals in this business, If you are interested in any of our products or would like to talk about a prospective get, you should truly feel cost-free to contact us. Product Description:
EPTTl EPT
Main Attributes:
Form and Sort
Variety | EPT | Floor Therapy |
Add-ons | ||
StraigEPTT Variety | |||||
Straight Bore |
Straight Bore EPTTp |
Keyway EPTTp | |||
EPT | EPTT | KEPTT | 1045 EPTT Metal |
– | Set Screw (4137 Alloy Metal Black OXiHu (West EPT) Dis.de) |
SAM | SAMT | KSAMT | Black OXiHu (West EPT) Dis.de | ||
SB | SBT | KSBT | |||
SUM | SUMT | KSUMT | 304 Stainless Steel |
– | Established Screw(304 Stainless Metal |
SUMA | SUMAT | KSUMAT | Nickel Plating | ||
SUB | SUBT | KSUBT |
EPTTl EPT
one. Make strictly in accordance with EPTT or DIN stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd dimension
2. EPT: SCM 415 metal, SUS 304
three. Bore: Finished bore
Item title | EPTTl EPT |
EPTs Available | Stainless Metal, EPTT Metal or as your layout |
BORE | Finished bore, Pilot Bore, EPT ask for |
Processing Strategy | Molding, Shaving, Hobbing, Drilling, EPTTpping, Reaming, Handbook Chamfering, EPT etc |
Pressure Angle | twenty Diploma |
Hardness | 194HB or considerably less |
Measurement | Client Drawings amp ISO stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd |
Deal | EPTen Circumstance/Container and pallet, or manufactured-to-purchase |
Certificate | ISO9001:2008 |
EPT Time | Within thirty daEPTTafter get your payment |
Specification:
Component Number | Shaft Bore Dia. PH7(1mm Increment) | Amount of Teeth |
J | B | C | D | E | F | G | H | ||
Type | Module | StraigEPTT Bore StraigEPTT Bore EPTTp |
Keyway EPTTp | |||||||||
StraigEPTT Bore EPT, SAM, SB SUM, SUMA, SUB StraigEPTT Bore EPTTp Keyway EPTTp |
one. | six | 8 | 20 | four.3 | sixteen | 20 | 21.41 | 21 | fourteen.53 | eleven.71 | nine |
six | 8, ten | twenty five | five.three | twenty | 25 | 26.41 | 23 | 14.seven | eleven.21 | 8 | ||
8 | 8, ten, 12 | thirty | six.two | 22 | 30 | 31.41 | 26 | fifteen.89 | eleven.seventy one | eight.nine | ||
one.twenty five | 8 | 10 | 20 | 6 | 22 | twenty five | 26.seventy seven | 23 | fifteen.27 | 11.38 | 9 | |
8 | ten, | 25 | seven | 25 | 31.25 | 33.02 | 28 | 17.88 | 13.26 | 9.twenty five | ||
ten | ten, twelve, fourteen | 30 | eight | thirty | 37.five | 39.27 | 36 | 23.47 | eighteen.thirteen | thirteen.five | ||
1.5 | ten | ten, twelve | 20 | six.8 | 24 | thirty | 32.twelve | 28 | 18.53 | 14.06 | 10 | |
10 | ten~fourteen | twenty five | seven.5 | 30 | 37.five | 39.sixty two | 34 | 21.26 | sixteen.31 | 11.5 | ||
twelve | twelve~sixteen | thirty | 9.three | 33 | 45 | 47.twelve | 38 | 22.eighty three | sixteen.fifty six | 12.34 | ||
2. | ten | twelve | 16 | seven | 27 | 32 | 34.eighty three | thirty | 19 | 15.forty one | 11.5 | |
twelve | 12~14 | twenty | 8.five | 34 | 40 | 41.32 | 37 | 24 | 18.forty one | 14 | ||
12 | 12~16 | 25 | 10.5 | 42 | 50 | 51.33 | forty | 23.34 | 16.41 | 10.ninety nine | ||
twelve | 12~eighteen | 30 | 12.4 | forty four | 60 | 61.36 | 51 | 30.77 | 22.forty one | 16.seventy nine | ||
two.5 | twelve | 14 | sixteen | 9 | 34 | forty | 43.53 | 35 | 21 | sixteen.seventy seven | twelve | |
14 | fourteen,16 | 20 | twelve | 42 | fifty | 53.54 | 48 | 32.fifty four | 24.seventy seven | 19 | ||
sixteen | 16~ | 25 | fifteen | fifty | sixty two.five | 66.04 | 50 | thirty.41 | twenty.52 | twelve.5 | ||
16 | sixteen~ | thirty | fifteen | 60 | seventy five | seventy eight.fifty four | sixty two | 36.28 | 26.27 | seventeen | ||
3 | fourteen | sixteen | sixteen | 11 | forty two | 48 | 52.24 | 40 | 23 | eighteen.twelve | thirteen | |
16 | 16~ | twenty | 15 | 50 | sixty | 64.24 | fifty eight | 39.84 | thirty.twelve | 23 | ||
20 | twenty~ | 25 | twenty | 60 | 75 | 79.24 | sixty | 37.81 | 24.62 | fifteen | ||
20 | twenty~ | thirty | 20 | 70 | ninety | ninety four.24 | seventy five | 45.forty seven | 32.twelve | 20 |
EPTT and Shipping:
EPTT | EPTethylene bag or oil paper for each merchandise Pile on carton or as customer’s demand from customers |
Supply of Samples | By DHL, Fedex, UPS, TNT, EMS |
EPT time | ten-fifteen doing work daEPTTas usual, 30daEPTTin occupied EPTTon, it will primarily based on the in depth orEPTTquantity. |
FAQ:
Major Markets? | North The us, South The united states, EPTern Europe , West Europe , North Europe, South Europe, Asia |
How to get? | * You send out us drawing or sample |
* We have by means of venture evaluation | |
* We give you our style for your confirmation | |
* We make the sample and ship it to you after you verified our style | |
* You validate the sample then location an orEPTTand pay out us thirty% deposit | |
* We begin making | |
* When the merchandise is completed, you pay out us the equilibrium after you verified pictures or monitoring quantities. | |
* EPT is carried out, thank you!! |
Payment: T/T
If you are interested in our items, make sure you explain to us which supplies, sort, width, length u want.